Getting a Home Ready for Winter Before the Weather Turns

0
33
Home

Before the cold weather sets in, a home needs a handful of maintenance jobs done while there’s still time to book an engineer, clear the gutters and check for draughts. Doing this in September or October, rather than waiting for the first frost, means fewer surprises once the heating goes on properly. A boiler not looked at since spring, gutters clogged with leaves, and draughty windows all become far more noticeable, and expensive to fix, once temperatures drop.

Most of the jobs involved are ordinary maintenance rather than anything urgent, which is exactly why they get put off. Booking the boiler service, sorting out draughts, protecting outdoor pipes and clearing the gutters are the four areas that make the biggest difference to how a home copes once winter arrives.

Book the Boiler Service Before Engineers Get Busy

September and early October are the easiest months to get a boiler service booked, since most households only think about heating once the weather has turned. A service typically takes under an hour and covers checks on the flue, burner and gas pressure that a Gas Safe engineer carries out annually, and catching a worn part now is cheaper than a January breakdown. Some households pair the service with gas boiler breakdown cover, since a single call-out over Christmas can cost more than a year of cover.

Deal With Draughts Around Doors and Windows

Draughts account for a meaningful share of the heat a home loses over winter, and the worst offenders are usually the front door and letterbox. Fitting a brush strip along the bottom of the door and a letterbox flap deals with the largest single source of cold air in most homes, and the materials cost very little compared with what they save. Older sash windows are worth checking next.

Protect Outdoor Pipes and Taps

Pipes and taps outside the house, along with pipework running through a garage or loft, are the parts most likely to freeze once temperatures drop below zero. A length of foam pipe insulation from a DIY shop is enough to wrap exposed pipes and cut heat loss around the tank and cylinder too, and the job takes an afternoon rather than a weekend. Outside taps are worth covering before the first frost.

Clear the Gutters Before the Leaves Properly Fall

Leaves and moss build up fast through autumn, and a blocked gutter sends rainwater straight down the wall instead of away from the house, which is where damp problems start. Clearing debris by hand, checking the brackets are secure and confirming downpipes aren’t blocked takes an hour or two on a dry day and avoids a bigger bill later. It’s worth doing before the clocks change, since shorter days make a ladder less appealing.

Spread the Jobs Across a Few Weekends

None of these jobs need doing on the same day, and trying to fit them all into one weekend tends to mean some get rushed or skipped. Booking the boiler service first makes sense, since it has the longest lead time, and the rest can follow over the next few weeks. A home with its boiler checked, draughts sealed, pipes protected and gutters cleared is in better shape than one still working through the list once frost arrives.